SP88 / VAN POWER & HEATING

Power for your
working day.

Renogy batteries, chargers and inverters fitted around your van and the equipment you use.

Wallington · Sutton · Croydon · Purley · South London & nearby Surrey

What do you need to power?

Choose a complete system or improve the setup you already have.

01 / WORK VANS

Tools & everyday equipment

Charging for tools, laptops and equipment, sized around your working day.

02 / CAMPERVANS

Power for time away

Leisure batteries, charging and monitoring matched to your trips.

03 / UPGRADES

Improve an existing system

Lithium, DC–DC charging, solar enquiries and inverter upgrades.

Your kit. Your choice.

Supply and fit, or installation of suitable equipment you already own.

INVERTERS

1,000W · 2,000W · 3,000W

We check your combined loads and starting demand before recommending a size.

BATTERIES & CHARGING

A system that works together

Battery capacity, charging sources, protection and available space are assessed together.

OTHER BRANDS

Considering an alternative?

Explore our Victron installation service, or ask about Fogstar leisure batteries. Exact models are assessed first.

Clear starting prices.

Your written quote confirms the exact equipment, materials and scope.

LABOUR ONLY

Fit your power kit

From £800

Battery, DC–DC charger and inverter installation. Materials extra. Allow 1–2 days.

SUPPLY & FIT

Renogy example package

From £1,995

Two 100Ah LiFePO4 batteries, 2,000W inverter, 50A DC–DC charger, monitor and standard installation.

PARTS ONLY

Equipment supply

By quote

Send a product link or model number. Price and availability confirmed before payment.

Example package: standard cabling, fuses, isolation, setup and testing included. Solar and existing mains alterations quoted separately. Allow two fitting days.

The details, when you need them.

Installation safety & protection

Safety components for work-van and campervan power installations

A safe installation needs more than a battery and inverter. This checklist explains the equipment to assess for your vehicle; it is not a universal parts list or a DIY wiring guide. Exact components, ratings and any specialist electrical work must be specified in the written quotation. Not every optional item below is included in the starting package.

Battery protection and 12V distribution

  • Secure battery restraints and terminal covers; a battery/BMS rated for the intended loads and charging conditions.
  • DC-rated main and branch fuses with covered holders, selected for cable protection and the battery bank’s potential fault current. Lithium installations require adequate fuse breaking capacity; Class T or another suitably rated solution may be specified.
  • A correctly rated battery isolator and dedicated high-current inverter supply protection.
  • Appropriately sized flexible copper cables, correctly crimped lugs, insulation, cable supports, grommets and abrasion protection.
  • Covered positive and negative busbars where needed, and a covered DC fuse board with individually protected small-load circuits. An ordinary blade-fuse board is not the inverter’s high-current supply path.
  • Compatible DC–DC charging equipment, charging-circuit protection and battery monitoring. Parallel batteries require manufacturer-approved interconnection and protection.

230V inverter supply and sockets

  • An inverter suitable for the intended appliances, continuous load and starting surges.
  • For a fixed socket installation, a suitable enclosed distribution unit with double-pole isolation, circuit overcurrent protection and 30mA RCD/RCBO protection selected for the inverter and loads.
  • Protective conductors and vehicle bonding appropriate to the designed supply arrangement. Any neutral–earth bonding relay must be specified by the exact inverter’s instructions; do not add an improvised bonding link.
  • Secure sockets, suitable AC cabling, strain relief, mechanical protection and separation from DC wiring. Chained extension leads should not form the permanent distribution system.
  • Where external mains is fitted: a suitable inlet, input protection and approved changeover arrangement preventing backfeed, with earthing and protection checked in both inverter and mains modes.

A plug-in RCD alone does not establish that an inverter installation is safe. Protection depends on the source configuration. Its test button does not replace installation testing. Renogy models differ: some specifically require an external neutral–earth bonding relay and RCD/RCBO. The exact model manual must be checked.

Mounting, ventilation and handover

Allow the equipment manufacturer’s cooling clearances and protect equipment from water, heat, cargo damage and blocked vents. Battery ventilation requirements depend on battery type. Provide accessible isolation, circuit and load-limit labels, and operating instructions.

Before use, a competent person must inspect and test the completed installation, including protective-conductor continuity, polarity, appropriate insulation checks and instrument verification of protective-device operation in each supply mode. The applicable electrical requirements, test records and any specialist certification must be agreed for the job; this checklist is not a certificate.

For diesel heaters, combustion-air, exhaust, fuel, ducting and electrical requirements need a separate model-specific assessment: see our diesel heater installation service.

References: Victron DC wiring and fuse selection; HSE electrical equipment and RCD guidance; Renogy model-specific protection requirements.

An inverter’s wattage is its output limit, not the amount of energy stored. Appliance starting surges, combined loads and runtime all matter. As an illustration, 2,000W at 12V and 90% efficiency draws about 185A from the battery bank, before other loads. Actual current varies with voltage and efficiency.

We check battery/BMS continuous and surge ratings, charging capacity, cable routes and protection together. Two batteries do not automatically make a suitable bank; matching and parallel connection must follow the battery manufacturer’s requirements.

Browse Renogy products

Browse products by category

Browse the complete Renogy UK product catalogue for every current listing and variant. Manufacturer prices, specifications and availability may change; these links are not an SP88 stock list.

Manufacturer links are reference links, not affiliate links. Manufacturer checkout is separate from an SP88 order.

Choosing batteries & alternative brands

We compare capacity, current limits, charging compatibility, space and budget. A larger inverter does not increase battery runtime.

Explore Victron Energy and Fogstar, then send us the exact products for assessment.

Assessment, deposits & fitting dates

Free initial WhatsApp photo assessment. An in-person assessment is £100, credited against an installation booked within 30 days. Once the specification and price are agreed, the deposit is £100 for labour-only fitting or 30% for supply and fit. Balance after installation and testing. Dates are confirmed after assessment.

Start with your van.

Send your vehicle, postcode and a few photos. Tell us what you want to run, heat or repair.